Meet outside the clubhouse at 10:00.

Continuing with improvements to the slipway the next task is to refurbish the trolley.  The old rotten wood needs removing, if this is something you could do please arrive with suitable clothing and gloves.  It would be helpful if you could bring your own tools to get this job started.
The metal chassis then needs wire brushing ready for painting.
Other jobs include:

Christmas decorations to be returned to loft
 Clean the fridge in the kitchen
 Remove the broken fridge from the kitchen store ready for someone to take it to the tip
 Rub down the front doors to the clubhouse and kitchen ready for painting

As usual there will be coffee tea and biscuits .

A good turnout of members, so all the above jobs were undertaken. Plus as the weather was mild and dry, some painting was done. Undercoat on the club house doors and a first coat on the slipway trolley. Additionally many of the wooden benches were sanded down prior to treating with wood stain.

 

Leave a Reply

 

Theme by HermesThemes

Copyright © 2019 Black Buoy Cruising Club. All Rights Reserved